Been very busy over the last 2 weeks and starting to see some significant progress.
Things done:
* All planter boxes completed, rendered and painted
* Alfresco area rendered and painted, outdoor BBQ built
* Front area shaping, leveling and preparation for grass.
* Side pathway levels raised 300mm to compensate for stairs and stormwater
* Pool area tiling completed. We went for Villastone pavers (600x400) in the limestone colour
* Outdoor shower built with hot and cold water
* Pool stage 2 installed, filtration hooked up, power, lighting etc etc
* Travertine laid in Alfresco area
This week sees (hopefully) the side fencing installed, pool frameless glass fencing, turf prep and installation.
Some latest photo's below.

Travertine tiles in Alfresco area

Pool paving completed

Outdoor shower installed

Side area raised ready for paving

Alfresco area rendered and outdoor BBQ walls built